Quality policy

Prompt Heat Exchangers
Back

Our company’s quality management system is based on the ISO 9001:2015 standard.

 

WE USE 4 STAGES OF QUALITY CONTROL:

  • Incoming inspection of materials
  • Interim control in the manufacturing process
  • Final testing
  • Visual inspection before delivery.

 

FINAL TESTING IS PERFORMED BY:

  • Compressed air test at a 7 bar pressure in a water tank.
  • Compressed air test at a 24 bar pressure for 10 minutes.

100% of our heat exchangers are tested!

Our selection software and coils have been developed in cooperation with independent laboratories.

 

TESTS PERFORMED:

  • Air pressure drop
  • Water pressure drop
  • Heat transfer.

 

HEATRUN PROVIDES MORE THAN A PRODUCT:

  • 2 years warranty from any defects
  • Response to a claim in 1 working day
  • Replacement parts will be ready in 2 working days.


Heating coils

1476958462_0_sildytuvas_1-8b69f99dd81ad1699a65f7b59e17ea23.jpg
We offer a wide range of finned coils for heating systems. Several options of materials and coatings expands are available upon request.
More